  • If the program is on the DOT&E Oversight List, which Test and Evaluation (T&E) product is required before the Full Rate Production Decision Review?
  • Who has the authority to issue a written order directing a contractor to make a change without prior agreement?
  • Which of the following is a required source selection evaluation criterion for any defense acquisition program?
  • Which organization type is more likely to decentralize staff functions by dedicating them to each business or product organization?
  • Which DoD Appropriation Category should be used for a contract modification to fund development and testing of a product improvement if the mod is meant to increase the performance capability of the system?
  • What is the name of the document that describes how the sustainment strategy will be implemented?
  • Using the Capability Maturity Model Integration for Development (CMMI-DEV), an organization whose process improvement capabilities were well defined both in individual process areas and across multiple process areas would be rated at least:
  • Your IPT is expanding a base in the Mediterranean. Budget cuts will severely limit on-site meetings. What should you do to communicate and motivate your team?
  • The Cybersecurity Strategy annex to the Program Protection Plan is appended to which plan?
  • For a modification that requires extensive developmental testing and independent operational testing, which type of appropriation should be used?
  • Based on the described Air Force scenario, what is the best entry point for the program?
  • Which of the following is one of the 5Ms of Manufacturing?
  • You are an Integrated Product Team (IPT) Lead/Project Manager confronting resource allocation issues and an interpersonal conflict that require quick and decisive action. Which decision-making method would be the best fit?
  • Which of the following is a primary objective of the Systems Acquisition Management process?
  • Which entity is responsible for worldwide contract administration services?
  • What is used to create the Acquisition Program Baseline?
  • What type of contract provides for payment to the contractor of a negotiated fee that is fixed at inception?
  • During source selection, who is the focal point for answering questions from potential offerors?
  • Which statement best describes Best Value procurement?
  • Which document is developed as a result of assessing foreign collection threat to an acquisition program?
  • Which leadership style describes a person who involves staff in discussion and decision-making to resolve conflict and implement change?
  • Budget law violations occur when an organization obligates more funds than are available in an appropriation. This is prevented by which act?
  • In IPPD, concurrent development implies which of the following?
  • Which term describes a design optimized for ease of fabrication and assembly?
  • In the Mediterranean base expansion scenario, how is the team expected to react to budget cuts that limit on-site meetings?
  • Maintainability is how quickly, easily and cost effectively a system can be returned to operational status after maintenance is performed. It is measured by ______________.
  • Which document is produced when a Capabilities-Based Assessment identifies a non-materiel solution?
  • What is the ability of systems, units, or forces to provide data, information, materiel, and services to and accept the same from other systems, units, or forces and to use the data, information, materiel, and services so exchanged to enable them to operate effectively together?
  • A contract is a legal instrument that defines the rights and responsibilities of:
  • What is the term for a threat capability or threshold established collaboratively by the requirements sponsor and the component capability developer, changes to which could critically impact the effectiveness and survivability of the proposed system?
  • Which body approved the Initial Capability Document in the Air Force scenario?
  • Which of the following is NOT one of the five pillars of Cybersecurity as identified?
  • In Systems Engineering, verification primarily answers which question?
  • Which group is responsible for managing system-level interfaces?
  • In a Capability Development Document, which two key values are identified for each performance parameter to bound the design while allowing flexibility to meet user needs?
  • Which office provided study guidance for the Analysis of Alternatives (AoA) in the described Air Force scenario?
  • Which IPS Element involves identification, review, assessment, and resolution of deficiencies across a system's life cycle?
  • Which type of Operational Test and Evaluation assesses vulnerability and includes live-fire scenarios?
  • In determining the correct appropriation for funding the development of a product improvement, the first/primary consideration is:
  • Unresolved supportability issues may result in each of the following, except which one?
  • In the same scenario, what is the greatest potential impact of the changes requirements on the Test & Evaluation Functional Area?
  • The overall efforts of the Intelligence Community (IC) are administered by the ODNI, which is the:
  • Which problem-solving tool is best suited to identifying root causes by showing cause-and-effect relationships?
  • Which process is recommended for those products with the highest volume and highest standardization on the product continuum?
  • Which agency apportions budget authority to the DoD's comptroller on a periodic basis?
  • Which office is responsible for independent assessment of the effectiveness and suitability of new weapon systems?
  • Which characteristic makes Mean Time Between Failure (MBTF) an effective performance metric for a 24/7 security information management system?
  • Flyaway Cost refers to which expense?
  • Which problem-solving tool would best be used to graphically depict the frequency distribution of data items using a vertical bar chart (columns) format?
  • Reliability is how long an item or system will perform its function before it breaks. Good reliability will __________.
  • In a CRA situation, authorizing work to avoid losing a key engineer can put you in conflict with which rule?
  • An effective organizational structure supports which primary outcome for a company?
  • In CMMI-DEV, an organization with process improvements well defined across multiple process areas would be rated at least what level?
  • The database that contains the force structure, personnel strength, and financial resources of DoD is the:
  • Which International Acquisition and Exportability objective addresses the need to strengthen domestics and allied defense industrial bases?
  • Technical Performance Measures (TPM) should be selected for those parameters that:
  • What is a characteristic of a Joint Capabilities Technology Demonstration (JCTD)?
  • Which testing phase in system development is primarily concerned with determining whether the system’s outputs meet the defined baselines?
  • Which system is used to create the Acquisition Program Baseline (APB)?
  • A program office can save 10% on overall life cycle cost by reducing the communication range KPP by 5%. Choose the greatest potential impact of the changed requirements on the Systems Engineering Functional area.
  • The five pillars of Cybersecurity are availability, integrity, nonrepudiation, confidentiality, and which?
  • Which costing method is described as being driven by expert rounds to reach consensus?
  • Which is recognized as a barrier to successful implementation of Integrated Product and Process Development (IPPD)?
  • High reliability in a product will directly reduce which of the following logistics aspects?
  • Which document details all aspects of the source selection process including evaluation criteria?
  • Which three-step process is required for federal appropriations?
  • Which statement correctly describes the role of the Critical Design Review in the DoD acquisition process?
  • Cybersecurity planning activities, including writing the Cybersecurity Strategy annex to the Program Protection Plan, should begin during which phase?
  • The Army is testing a laser-guided rifle to assess lethality. What type of testing is this?
  • The Program Management Office creates a(n) ______________ plan for each fiscal year of funding that is available for new obligations and a(n) ______________ plan for each fiscal year of funding that has not been completely expended.
  • For a mass-production system, the majority of a system's life cycle costs are attributed to which category?
  • Your team is working on an information management system and there is disagreement over the functional test plan. You focus on defining the functionality where there is general agreement. This is an example of which conflict resolution technique?
  • Who provides an independent assessment of the effectiveness and suitability of new weapon systems?
  • Which risk mitigation strategy involves transferring risk to another entity?
  • The type of contract is based upon which of the following?
  • Which scenario correctly matches the testing approach described as development testing plus independent operational testing?
  • In the affordability analysis, what was the percentage life cycle cost savings achieved by trading 5% of the KPP for greater component reliability?
  • A program used procurement funding to build a maintenance facility instead of procuring items. Which act is violated?
  • What type of testing is performed to determine a weapon system's performance with respect to survivability and lethality?
  • Which appropriations category funds the Research and Development efforts performed by both contractors and government agencies?
  • What does the Program Protection Plan (PPP) help you develop for dissemination and implementation throughout the program?
  • As part of the DoD-recommended TEMP format, which document serves as a starting point for organizing a successful Test & Evaluation program?
  • Which term describes the ability of different systems to work together by exchanging data and utilizing shared services?
  • DAMIR is used to create which baseline?
  • In a scenario where the contractor's project manager grants the afternoon off and the government program manager grants a 59-minute early dismissal, which statement is correct regarding charging time off to the government contract?
  • Which statement best describes the use of Technical Reviews in the current acquisition environment?
  • Which statement best describes Best Value source selection procedures?
  • Forward Pricing Rates Agreements (FPRA) are written negotiation agreements between the contractor and Government that __________.
  • After unexpended RDT&E funds have expired, these funds can be used for which of the following?
  • Select the type of Operational Test and Evaluation that assesses vulnerability required by Title 10 U.S.C. 2366.
  • In the Engineering and Manufacturing Development phase, which document provides the capability needs and performance attributes to be achieved?
  • Team charters establish which of the following?
  • What is the focus of sustainment operations during the Operations and Support phase?
  • DoD services submit Program Objectives Memoranda (POM) to OSD during which PPBE phase?
  • During which step should the Product Support Manager gain participation of Government and private-sector subject matter experts, industry and all appropriate stakeholders, including Warfighter representatives?
  • The DoD Instruction addressing the Operation of the Adaptive Acquisition Framework is DoDI 5000.02. In which option is this DoDI listed?
  • Which of the following is a way the government communicates requirements to a vendor during a source selection?
  • Which of the following statements is FALSE regarding exit criteria in an acquisition program?
  • Which statement best captures the objective of JCIDS?
  • What is the Government's basic purpose of using the CMMI and the associated Standard CMMI Appraisal Method for Process Improvement (SCAMPI) assessment process?
  • After identifying the members of your Integrated Product Team(s) (IPT[s]), which of the following is important to developing proper team dynamics?
  • What is the purpose of a Life Cycle Cost Estimate (LCCE)?
  • What is the purpose of the Program Protection Plan (PPP)?
  • Which document is intended to guide the protection of technology, components, and information within a program?
  • Milestone A follows which phase?
  • Which factor is identified as the key to system readiness in the provided context?
  • What is the JCIDS top-level metric?
  • A highly producible design will increase
  • Who approved including the changes as part of staffing for the CDD-V in the Navy program?
  • Learning curve estimates may NOT apply if ________.
  • What is a primary objective of the Defense Acquisition System?
  • What is the purpose of fielding/deployment planning?
  • During development, teams outline other aspects such as testing, support, and a training plan, reflecting which IPPD tenet?
  • Which of the following describes the primary purpose of the Systems Engineering Plan?
  • In the same scenario, what is the greatest potential impact of the changes requirements on the Contracting Functional Area?
  • The Termination Contracting Officer (TCO) is responsible for:
  • When the Government has funded the entire development of an item, the Government is entitled to _______ rights.
  • In the competitive range, how many offerors will be invited to engage in discussions?
  • Which of these is NOT a benefit of a Federally Funded Research and Development Centers (FFRDC)?
  • What is the purpose of an Acquisition Strategy (AS)?
  • Which analysis tool identifies steps, spares and materials, tools, support, equipment, and personnel skills levels?
  • Initial Operational Test and Evaluation (IOT&E) occurs in which phase of the major capability acquisition pathway?
  • IPPD is an acronym used in program management. What does IPPD stand for?
  • Which directive governs the development of requirements documents within the DoD?
  • Which document guides activities in the Engineering and Manufacturing Development (EMD) phase?
  • Select the document that establishes policies and procedures for developing, reviewing, validating and approving the capability documents required by the Joint Capabilities Integration and Development System (JCIDS).
  • Which assessment method uses a standardized framework to appraise software process maturity and capability?
  • Which factors determine the extent of developmental testing and evaluation required for a commercial or non-developmental item?
  • What is a primary benefit of using Commercial Off the Shelf (COTS) software for a software acquisition program?
  • PPBE stands for which budgeting process?
  • What does reprogramming permit the DoD to do with Budget Authority (BA)?
  • Forward Pricing Rates Agreements are negotiated between which parties?
  • In the Army's RFP scenario, which information exchange would the contracting officer use to obtain the offerors' best and final proposals?
  • The capability of a system design to support operations and readiness at an affordable cost throughout the system's life is best described as ______.
  • Which SE technical process provides evidence that the system performs its intended functions and meets performance requirements?
  • Which of the following technical reviews are you most likely to find only in the Production and Deployment phase?
  • Which document was approved by the Air Force Requirements Oversight Counsel before CAPE provided AoA guidance?
  • Which of the following performance-based metrics assesses Materiel Reliability?
  • Statistical process control is used to measure which attribute of a manufacturing process by charting random and unique events?
  • Which system engineering process establishes and maintains the consistency of a system's functional, performance, and physical attributes with its requirements, design, and operational information and provides technical insight into all levels of the system design across the life cycle?
  • What does PPBE stand for in the DoD budgeting process?
  • The _______ includes details of processes, procedures, and materials used in fabrication and is usually controlled by the contractor.
  • In JCIDS governance, which instruction establishes policy for capability document development?
  • Defense policy requires designated systems to be certified as interoperable. In part, testing to ensure interoperability is conducted to determine if the system is:
  • During the Developmental Test (DT) effort, the purpose of verification is to determine ____________.
  • If a government program is behind on several critical objectives, which statement reflects the ethical responsibility?
  • Which JCIDS document is used to build upon the Initial Capabilities Document (ICD)?
  • What was the stated purpose of the affordability analysis in the Navy example?
  • Who must be briefed when there is a CI impact, along with the Milestone Decision Authority (MDA)?
  • Availability is the key to system readiness. Which of the following is a contributor to system downtime?
  • In the TEMP framework, which document is used as a starting point for organizing a successful T&E program?
  • Mean Time Between Failures is used to assess which aspect of a system?
  • Which document provides guidance on the development of requirements documents within the DoD acquisition framework?
  • Which of the following is NOT a benefit of an FFRDC?
  • Which design feature is NOT likely to improve supportability?
  • Team charters establish which of the following?
  • What is the Defense Contract Management Agency (DCMA) responsible for providing?
  • Which of the following is considered a Lean Manufacturing practice?
  • Which scenario would most undermine the usefulness of MBTF as a metric?
  • In ethical decision-making, inviting only the contractor to the System Requirements Review while excluding the warfighter violates which step?
  • Milestone A follows which phase?
  • General and administrative contract expenses are assigned to which cost category?
  • The initiative to identify and pursue cooperative opportunities in emerging technology on a global basis to enhance coalition capabilities supports which DoD Security Cooperation objective?
  • In the risk management model, after risk identification, which activity occurs?
  • The two main principles of lean manufacturing are ______?
  • Which plan tracks funds that have not been completely expended by the end of the fiscal year?
  • From which organization does the Navy obtain negative past performance information about a contractor?
  • A software costing method that uses a team of experts working both independently and together to combine different approaches and arrive at a collective judgment through consensus is an example of the _________ costing method.
  • Which description best matches the initial activity in the planning phase?
  • As the team lead, you tasked your designer to create a template for a briefing presentation. Which decision-making method best describes your interaction with the designer?
  • Select the Department of Defense's decision-support system that manages the process by which DoD develops and acquires weapons and other systems.
  • A specification that defines the function, performance, and interfaces of a product but does not specify explicit design and materials is called what?
  • You have been assigned to lead a new program. ... In which stage of the team life cycle process are you operating?
  • What is the primary purpose of requirements traceability in Systems Engineering (SE)?
  • Which Test and Evaluation product is required at Milestone C?
  • What does RFP stand for in procurement?
  • Which functional area would experience the greatest impact when there is a change to the manufacturing process?
  • Which term describes the process of managing changes to the system's configuration and baselines over time?
  • Which institution sets resource ceilings and provides Budget Authority for the Department of Defense (DoD)?
  • The Future Years Defense Program (FYDP) is used to track which DoD resources over time?
  • Which document explains how technical activities will be managed in a program?
  • Should-cost is described as:
  • In forming the Product Support Management IPT, which participants should be included?
  • Estimates based on learning curve theory may NOT apply if ________.
  • Which problem-solving tool graphically depicts the relationship between the problem and its causes and can be used to help determine the problem's root cause(s)?
  • A configuration management program should focus on ensuring designs are traceable to capability needs, developmental changes are controlled and documented, interfaces are well-defined and understood, and ________________.
  • The Initial Capabilities Document (ICD) becomes the basis for which phase?
  • Flyaway Cost refers to which expense?
  • If there is a Counterintelligence (CI) impact on a program, which two roles are briefed to ensure the strategy continues to make good business sense, effectively implements laws and policies, and reflects management's priorities?
  • Which document would specify the products to be delivered and the technical reviews to be conducted by the contractor?
  • A contract scenario where a widget is made bigger at the request of a worker, resulting in a higher invoice, illustrates which concept?
  • Which of the following exceptions to the full funding policy would allow the Government to budget for buying three years' worth of engines under one contract in order to save money?
  • What does TRL stand for in the context of technology readiness?
  • Live Fire Test & Evaluation (LFT&E) is conducted to assess what aspect of a weapon system?
  • In the Navy shipboard system affordability scenario, what is the greatest potential impact of the changes requirements on the Logistics Functional Area?
  • Counterintelligence (CI) organizations use information about CPI and its projected use to determine the foreign collection threat to an acquisition program and subsequently the _________.
  • In which phase of the Defense Acquisition System is competitive prototyping usually required?
  • Which analysis tool focuses on maintenance tasks and the resources required to support them?
  • Which cost estimating technique is indicated when the program is in the early Engineering and Manufacturing Development phase, a quick what if estimate is needed, some subjectivity is allowed, and a good database exists of similar systems?
  • Which theory of motivation is illustrated by planning actions based on expected outcomes and perceived rewards?
  • Which document establishes a flexible management framework for translating approved capability needs and technology opportunities into stable, affordable, and well managed acquisition programs?
  • Which option best completes the statement about the Cybersecurity Strategy annex in the Program Protection Plan?
  • What term describes the formal plan detailing how the system will be sustained after deployment?
  • How many proposals did the Navy receive in response to its RFP?
  • Who is responsible for the management of the system-level interfaces?
  • When should Affordability Goals be established?
  • A design that optimizes ease and economy of fabrication and assembly would be considered:
  • The Initial Capabilities Document is the basis for which DoD acquisition phase?
  • The approved detail design that results from which review serves as the basis for deciding to begin fabrication of production-representative prototype systems?
  • Manpower, measurement, methods, machinery, and materials are collectively referred to as the __ 5Ms of Manufacturing.
  • Which four-phase process does the DoD use to develop the proposed budget and allocate funds for all system acquisitions?
  • What budgeting review occurs for the next fiscal year while one fiscal year budget is being executed and enacted?
  • Which document is developed next if the Capabilities-Based Assessment (CBA) recommends a non-materiel solution?
  • Who must sign and distribute a contract before it becomes legally binding?
  • For a cost to be allocable to a contract, it must be a cost incurred specifically for a contract, or a cost that is beneficial to both the contract and other work, or ______.
  • Which term best describes the process that maintains a system's configuration across its life cycle and provides technical insight into design decisions?
  • Which statement is NOT true about Systems Engineering?
  • Which JCIDS metric is a top-level outcome-based metric?
  • Which statement best describes the objective of the acquisition process in terms of mission capabilities?
  • A program office for a command and control system needs to prepare a Statement of Work (SOW) that lays out the products to be delivered and the technical reviews to be held by the contractor. Which tool would they most likely use?
  • As part of the DoD-recommended Test and Evaluation Master Plan (TEMP) format, which document is considered to be one of the four parts of the TEMP that serves as a starting point for organizing a successful T&E program?
  • When designing software, DoD policy requires integrated architectures including operational architecture, systems architecture, and which other architecture?
  • Which contract type is described as a contract with a negotiated fee fixed at inception and reimbursement of allowable costs?
  • What is the primary objective of the Joint Capabilities Integration and Development Systems (JCIDS)?
  • Which of the following is one of the four common risk mitigation strategies described as 'Accepting (and Monitoring), Avoiding, Transferring, and Controlling'?
  • When you uncover adverse information about a government program's objectives, which action is correct?
  • Which objective addresses strengthening domestics and allied defense industrial bases?
  • Reflect on potential sources of assistance and resistance to the proposed solution is associated with which problem-solving step?
  • Which document best describes the purpose of the Systems Engineering Plan?
  • What percentage of the point to point surface communications range KPP was traded for greater component reliability in the affordability analysis?
  • What is the primary purpose of validation during Operational Testing?
  • LFT&E stands for which of the following?
  • Which plan specifically describes how the technical activities will be managed?
  • During the latter stages of the Technology Maturation and Risk Reduction (TMRR) phase a new and critical technology prototype for ground mapping and targeting radar was assessed by independent evaluators as Technology Readiness Level (TRL). Which statement can be CORRECTLY DETERMINED from the information provided?
  • The risk management model includes process planning, risk identification, _______________, risk mitigation, and risk monitoring. What is the missing step?
  • Which entity is typically responsible for managing system-level interfaces in this program context?
  • In evaluating a defense contractor's past performance, what form of information exchange would the Navy use to obtain more details about late deliveries?
  • Which statement about configuration management is true given the described program?
  • Which of the following is a mandatory evaluation factor in every source selection?
  • The two main principles of lean manufacturing are which of the following?
  • Which acronym denotes the group of eight elements used in capability development?
  • When Congress does not appropriate sufficient funds to cover the cost of work to be performed under a contract, the Government may:
  • Which enactment process activity must be passed by both houses of Congress and signed by the President before any Federal agency can incur obligations or make expenditures from the U.S. Treasury?
  • Which configuration baseline provides the details from which a contractor can transition from design to production?
  • Which stage of the team life cycle is typically characterized by members experiencing conflict and trying to establish roles?
  • In the planning phase, which activity is described as identifying and justifying a mission need that requires a material solution?
  • Which document outlines how proposals will be evaluated and how the selection will be made?
  • In a program management context, which document explains how the program manager will manage the technical activities to be undertaken?
  • Which technical review is required for Milestone B prior to the Engineering and Manufacturing Development Phase and occurs when all major design issues have been resolved in the system preliminary design and work can begin on detailed design?
  • What is the focus of the Engineering and Manufacturing Development (EMD) phase?